7/3/09 - Did site survey and established LOS to GXT and ICQ - yah !
14/3/09 - Node build planning underway. Have procured Wind Turbine /
batteries for power
3/5/09 - Node installation has started, the pole is concreted in and
the cabinet base done, with many thanks to Will, David, John, Adam and
Mike for their assistance in wresting the pole into place !
7/5/09 - Have the turbine almost ready for install, will hopefully
visit this weekend to continue commissioning works.
10/5/09 - With many thanks to Michael, the turbine and enclosure are
all mounted. The prop will go on once the electrics are done & tested.
12/5/09 - Most of the electrics & breakers for the turbine have been
completed.
13/5/09 - Electrics completed and tested ok. Prop now on and turbine
seems to be working. Further testing required.
have also setup the weather station and an uplink ap. Uplink almost
online, will happen soon !
16/5/09 - Yah ! we're online and connected to the network ! Thanks
john for helping with the entertainment. (rode a road bike up a muddy
trail...)
17/5/09 - John has confirmed coverage at 10klm range no problem at
this stage.
28/9/09 - This node has been fully commisioned and in now
opperational.
it has been linked to at 20klm away, and a scan on the 26/9 from the
nobies at Phillip Island confirmed it does have line of sight that
far!
This node has been through lots of development of the past few
months but has now settled and balaced well with the renewable power
generation now exceeding needs by a healty margin.
Many thanks to all the people who helped get this node operational !
WAVEGUIDE IP ADDRESS ALLOCATION
(JAA Waveguide - 2.4Ghz - Usable range .2 to .12)
IP Address
Node
Status
Routing
Signal Received
Noise Level
10.10.133.1
(JAA gateway router)
UP 24x7
Full OSPF
10.10.133.14
(JAA Bullet AP)
UP 24x7
Static
10.10.133.11
NodeKEI [8]
Coming Online
TBA
-70
-95
EQUIPMENT
This node will be a Green node runs off wind
Wind Turbine & Associated Batteries / Power Management.
2.4Ghz Wave guide for Southern coverage of Hampton Park to Emerald to
phillip / french island ?
5.8Ghz Uplink to MW network connection done.
We have procured a wind turbine and some
decommissioned batteries to suit at this stage.
{http://www.melbournewireless.org.au/files/Images/picture.png Photo
of node setup" />
SERVICES
This node will provide an Uplink point and coverage
for the Narewarren / Berick / Hampton Park etc region.
PLANS
It's also planned to provide an up link to Aurthurs Seat in the near
future.
It will also be a bounce point to further connect KLG in the future
I intend to link up to NodeGXT [9]
I intend to link up to NodeJNA [10]
I intend to link up to NodeICQ [11]
PROBLEMS
Still Sourcing equipment such as
Shopping List
Decent pole for turbine - maybe ex 6mtr power pole - Sourced
Some 3 Wire cable to connect to turbine (6 ish Mtr) - Sourced
Cat 5 & conduit to run up pole to bullet ap's - to pickup
Standoff vertical poles 35mm ish to give mounting point for antennas.
6mtr solid pole - Sourced
Monitoring / routing access point - will use wl500gP with weather
station
& picaxe connection for battery monitoring - Have wl500gp just need
to program / test - need to make picaxe monitoring circuit - design
logic mostly done
Wind turbine - Have
Battery Pack - Have
Main Enclosure - Have & installed
Backbone [12]
Links:
------
[1] http://melbournewireless.org.au/nodes/view?id=JAA)
[2] http://melbournewireless.org.au/?jaa.melbournewireless.org.au
[3] http://melbournewireless.org.au/?melb_ap
[4] http://melbournewireless.org.au/?NodeKEI
[5] http://melbournewireless.org.au/?melb_ap
[6] http://melbournewireless.org.au/?jaa.melbournewireless.org.au
[7] http://melbournewireless.org.au/?melb_ap
[8] http://melbournewireless.org.au/?NodeKEI
[9] http://melbournewireless.org.au/?NodeGXT
[10] http://melbournewireless.org.au/?NodeJNA
[11] http://melbournewireless.org.au/?NodeICQ
[12] http://melbournewireless.org.au/?Backbone
[EditText] [Spelling] [Current] [Raw] [Code] [Diff] [Subscribe] [VersionHistory] [Revert] [Delete] [RecentChanges]
Node Statistics | |
---|---|
building | 132 |
gathering | 193 |
interested | 515 |
operational | 233 |
testing | 214 |